HDD

 

No. Project Location Client Scope of Work Distance
1 HDD—Atrush Road Crossing Shaikhan – Iraq TAQA Valley Crossing 16” 180m Length, Road Crossing 48” 125m
Length
305m
2 Atrush River Crossing Atrush—Iraq TAQA River Crossing with all requirements and accessories. 175m
3 HDD—Kar Group— Kalak Refinery Kalak—Iraq KAR 2 Pipeline starting from Kakal Refinery to Syria Border  
4 HDD— 132KV Cable Erbil—Iraq Alswaidy Group From Erbil Airport to Mayor House 3km
5 HDD—Electrical Cables Erbil—Iraq Iman Group 6” Sleeve for Electrical Cables 800m
6 HDD—Electrical Cable Erbil—Iraq Palos Group 6” Sleeve for Electrical Cables 700m
7 HDD— Cables Erbil—Iraq Erbil Municipality Several Project like Electrical cables or Fiber Optic
Cables
 
8 HDD— Fiber Optic Sulaymanyah—Iraq Asia Cell Several Project for fiber optic cables 20km
9 HDD— Fiber Optic Erbil—Iraq Newroz Telecom Fiber Optic Cables 12km
10 HDD— Electrical Cables Erbil—Iraq AlKAMAL Group—Egyptco Sleeves for Electrical and Fiber Optic Cables 40km
11 HDD – Pipeline Zakho & Kalar KAR Group Road Crossing for 600mm, and 1000mm diameter 5 Ea
12 HDD – Road crossing Sarsang – Shaikhan KAR Group Road crossing Casing 20″ 135m
13 HDD – Pipeline Crossing Bavian- Khenis Gulfkeystone Road crossing Casing 20″ 85m
14 HDD – Water pipeline Sulaymanyah—Iraq GAMA Group Prepare casing 20″ for road crossing 160m
15 HDD – Fiber optic Airport – Erbil Navigator Telecommunication cables in sleeves 850m
16 HDD – Pipeline Crossing Kalar – Sarqala 3 Gazprom 12″ Case for Pipeline 150m
17 HDD – Cables Erbil 120m St. Hemn Group 5″ Sleeves for Electrical Cable for the main Road of
120m St.
950m
18 HDD – Cables Erbil – Duhok Darin Group Sleeves for Electrical Cables & Water Pipelines 7km