No. | Project | Location | Scope of Work | Distance |
1 | Khormala – Kalak 24” Oil Pipeline | Erbil – Iraq | Welding, Tie in, lowering, bending, coating | 40km |
2 | Kalak– Alqosh 36” Oil Pipeline | Duhok – Iraq | Welding, Tie in, lowering, bending, coating | 80km |
3 | Semel – Fishkhabour 36” Oil Pipeline | Zakho – Iraq | Welding, Tie in, lowering, bending, coating | 41km |
4 | Bandawa-Kashe Power Plant 36” Gas Pipeline | Duhok – Iraq | Welding, Tie in, lowering, bending, coating | 20km |
5 | Kormala – Alqosh 24” &36” Oil Pipeline | Erbil-Duhok, Iraq | Hydrostatic test | 120km |
6 | Semel _ Fishkhabour | Duhok – Iraq | 36” Oil Pipeline Hydrostatic test | 41km |
7 | Semel – Fishkhabour | Zakho – Iraq | 36” Oil Pipeline Fiber optic and C.W. | 41km |
8 | Kashe Power Plant | Duhok – Iraq | 36” valve & Gas Pipeline and Piping | Connection to Pipeline |
9 | Kormala – Kirkuk ,36” Oil Pipeline | Kirkuk -Iraq | Welding, Tie in, lowering, bending, coating | 21km |
10 | Kormala – Kalak ,36” Oil Pipeline | Erbil – Iraq | Welding, Tie in, lowering, bending, coating | 20km |
11 | Fishkhabour – Turkey, 40” Gas Pipeline | Duhok, Zakho-Turkey boarder | Welding, Tie in, lowering, bending, coating | 5.5km |
12 | Debes, 24” Oil Pipeline | Kirkuk – Iraq | Welding, Tie in, lowering, bending, coating | 4km |
13 | CPS – Amin Unit Khormala | Erbil, Makhmor | 24” Gas Pipeline, piping & Valve installation | 3km |
14 | Kalak Refinery, 12” Oil Pipeline | Erbil, Kalak | welding, Tie in, lowering, bending, coating | 3.5km |
15 | Khormala New Pump Station 2014 | Erbil – Iraq | All Valve reducers and Lange and piping issues and final Hydro static test |
|
16 | Fishkhabour _ Turkey Side | Duhok – Iraq | 40” Hydrostatic test Gas Pipeline, | 4.5km |
17 | Fishkhabour -Turkey Rivercrossing | Duhok – Iraq | Piping and by pass connections | |
18 | Fishkhabour , Two Projects | Duhok – Iraq | Piping and Instrument of Oil Station, bypass | In station |
19 | Khormala New Pump Station | Erbil, Kalak | All Valve reducers and Lange and piping issues and final Hydro static test |
|
20 | Khormala Piping and Pump Station | Erbil – Iraq | Pipeline, Piping, Valve, Bracket, Reducer, .. | |
21 | Fishkhabour Station | Duhok – Iraq | Hot Taping 36” to 40” | |
22 | Atrush Main Export Pipeline | Atrush – Iraq | ROW, Trenching, Welding, coating, Lowering, Backfilling | 18.5km |
23 | Atrush Main Export Pipeline |
Atrush – Iraq | Temporary Roads, Access Roads |
Total6 Km |
24 | Atrush Road Crossing | Atrush—Iraq | Valley Cossing, Road Crossing | 4 Crossing |
25 | GIZ—Faida Water Pipeline | Faida—Duhok | Stringing, Bending, Welding, Coating, NDT, Hydrotest, | 18 Km |
26 | GIZ—Faida Water Pipeline | Faida—Duhok | Access Roads, Service Road, ROW, Trenching, Bidding, Backfilling, Road Reinstatement |
18 km |
27 | Well Pad D | Sarsang Block | Earth Work, Site Preparation, Concrete Foundation | 1 Block |
28 | Main Flow Line for Petoil | Chia Surkh—Kalar | ROQ, Welding, Testing | 2 km |
29 | EPF Site Preparation |
Chia Surkh—Kalar | Site Grading and Leveling, Well Pad Preparation | 3 Pad |
30 | Well Pad Hook Up Activities | Tawke—Zakho | Earth Work, Fabrication, Welding, Installation for Piping & Steel Skids. |
2 Well |
31 | Supply Valves | Tawke—Zakho | Supply 67 Valves with different Sizes and Specifications | 67 Valve |
32 | 16560 – T25N wellhead hook-up & T-11 Manifold extension for T25N tie-in |
Tawke—Zakho | T-25N Hook-up & T-11 Manifold extension, Including steel fabrication, piping activities such as fabrication, welding, installation, testing, painting, valve installation, till hand over to client. |
3 Manifold |
33 | 16788 – Surface Preparation and Painting of DNO Facilities. |
Tawke—Zakho | T22-T23 Manifold extension, Including steel fabrication, piping activities such as fabrication, welding, installation, testing, painting, valve installation, till hand over to client. |
2 Manifold |
34 | 17067- T-8W Wellhead Hook Up Works | Tawke—Zakho | T-8W Hook-up, Including steel fabrication, piping activities such as fabrication, welding, installation, testing, painting, valve installation, till hand over to client. |
1 Manifold |
35 | Pipeline 8" (for HKN-HAVATEK) | Sarsang – Duhok | Stringing, bending, welding, testing, lowering, and pigging (all the mechanical Activities.) |
2.4km |
36 | PIPING & STRUCTURAL FOR 4TH & 5TH EXPORT OIL PUMPS |
Pishkabir – Zakho | CONSTRUCTION SCOPE OF WORK MECHANICAL PIPING & STRUCTURAL FOR 4TH & 5TH EXPORT OIL PUMPS |
Export System |
37 | Cabin Fabrication & Installation | Erbil—Iraq | Installation of 2,350, Design, Manufacturing, Assembling and Installing Office and Accommodation Cabins in KRG for UN |
2,350 |