No. Project
1 Supplied 21 Guard shelter for sites for Darin in 2010.
2 Supplied Grounding system materials for 200 GSM sites for EMEK  in 2009.
3 Supplied 20 monopole GSM tower for Darin .
4 Supplied 10 lattice 4 legs tower for Darin .
5 Supplied tower lighting for 150 sites for Darin in 2009.
6 Supplied tower lighting and Flashers for 100 sites to Korek telecom.
7 Supplied 1620 Battery (155AH, NSB) North star for Korek from NSB USA .
8 Supplied 1530 Kathrien GSM Antenna to Darin co. from Germany by more than 2MUSD.
9 Supplied 160 GSM shelter to Mustafa co. in Sulemani with high quality in 2010.
10 Supplied SFP and fiber connector to Korek in 2011.
11 Supplied one site master Anritsu to Alsahla co. in Sulamania at 2011.
12 Fix very important main transmission Back bone of Korek network from Masif -Kirkuk Baghdad and Massif –Mosel-Baghdad routs and from Baghdad-Babil_Basra and Baghadd_Wast_Basra and Baghdad-Anbar till Jordan boarder routs, which was 67 Xpic Ericsson SDH and fix problem and mistake of them .
13 Doing some SDH space diversity for NSN( Nokia Siemens) co between Baghdad and Basra
14 Fix and maintenance of 13 sites in Sulymnia for Korek telecom 2015
15 dismantle and install new 3 sites in Baghdad
16 31KM fiber optic turnkey project from Pirmam to Erbil
17 21 Km Erbil ring fiber optic for Korek telecom
18 Test crude oil and give them treatment for H2s scavenger for khormala and Taqtaq field and Kevergosk refinery
19 Supply more than 1000 Drum chemical treatment (H2s scavenger, Biocide , Demulsifire ,     anti foam ,…… from Nalco USA.
20 Supply chemical injection for khormala field .
21 Supply special pipes and fitting and flange and elbow for KAR company
22 Maintenance 13 of 13 tower GF from KOREK Sulaymania sites  November 2015
23 Technical maintenance  korek in 17sites at 2 project in Baghdad 2016